Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

APPLYING HYDRAULIC FRACTURING IN EXTENDING PERFORATION LENGTH

MAHAMUD, MU'IZZUDDIN (2011) APPLYING HYDRAULIC FRACTURING IN EXTENDING PERFORATION LENGTH. Universiti Teknologi PETRONAS. (Unpublished)

[img] PDF
Download (2103Kb)

Abstract

"Applying Hydraulic Fracturing In Extending Perforation Length" is a final year project which consist of two parts, gather relevant literature data and simulate pressure transient. The main outcome is to evaluate the hydraulic fracturing treatment effectiveness in extending perforation penetration. The core of this project is simulation using pressure and production rate history in order to obtain reservoir data before and after hydraulic fracturing. The author has divided Final Year Project I (FYP I) into two phases namely, (1) Write literature review on the project, (2) Gather raw data on real case study continuously for the whole FYP 1. In Final Year Project 2 (FYP 2), it is the continuous from FYP 1 and focusing on full analysis of pressure and production rate data from real well. Kappa Saphir Well Test Software is the main tool for this project. Analysis can be performing after run the pressure and production data in the software. Firstly is analysis on the well test job sequence. During this part, the author will separate the fluctuation of plotted pressure data history accordingly to operation or job done following the time period. Thus, the author can know the response of the pressure towards the job done by engineer. Second, the author does the analysis on pressure transient. In this period, selected reservoir model and type curve will try to be match with the plotted pressure. As the model match, the well properties can be estimated. The analysis will be performing on pressure and production data before and after hydraulic fracturing treatment. For the last part, the author will evaluate the effectiveness of hydraulic fracturing. After gone through with this project, the author conclude that hydraulic fracturing can increase the production from a reservoir and perforation length as well as reservoir properties are changing after performed hydraulic fracturing.

Item Type: Final Year Project
Academic Subject : Academic Department - Petroleum Geosciences - Petroleum Engineering - Production and Completion Engineering - Well System Performance
Subject: T Technology > T Technology (General)
Divisions: Geoscience and Petroleum Engineering
Depositing User: Users 2053 not found.
Date Deposited: 06 Nov 2013 10:48
Last Modified: 25 Jan 2017 09:42
URI: http://utpedia.utp.edu.my/id/eprint/10157

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...