Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

Development of Key Performance Indicators for Process Safety Management System

Norazima Binti Mat Zaidi, Norazima (2010) Development of Key Performance Indicators for Process Safety Management System. Universiti Teknologi Petronas, Seri Iskandar,Tronoh,Perak. (Unpublished)

[img]
Preview
PDF
Download (1079Kb) | Preview

Abstract

Process Safety Management; also referred to as PSM is the application of management systems to the identification, understanding and control of process hazards to prevent process-related injuries and incidents. The major objective of process safety management (PSM) of highly hazardous chemicals is to prevent unwanted releases of hazardous chemicals especially into locations that could expose employees and others to serious hazards. Most of the company or plant only uses lagging indicators to measure their process safety performance and it has disadvantages since it indicates process safety performance after accidents occur. Thus, the effort to integrate both lagging and leading indicators had been discussed in this project. Based on the 14 elements of Process Safety Management (PSM), the most relevant Key Performance Indicators are selected and the metrics associated with them are identified. The focus of this project will be on Process Safety Incident for lagging indicators and Process Hazard Analysis for leading indicators. The calculations for both indicators are based on the guidelines and literature reviews available from the expertise of the process safety field. The main calculations are based on the severity level and score. Thus, a modified severity level and score had been developed to measure the safety performance system of the company or plant by using both lagging and leading indicators.

Item Type: Final Year Project
Subject: T Technology > TP Chemical technology
Divisions: Engineering > Chemical
Depositing User: Users 5 not found.
Date Deposited: 03 Nov 2011 11:23
Last Modified: 25 Jan 2017 09:43
URI: http://utpedia.utp.edu.my/id/eprint/1181

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...