Inspection Robot for Power Line

Ugasciny Arumugam, Ugasciny (2010) Inspection Robot for Power Line. [Final Year Project] (Unpublished)

[thumbnail of ugasciny_arumugam.pdf]
Preview
PDF
ugasciny_arumugam.pdf

Download (13MB)

Abstract

Power line cable and insulator inspection and verification procedures require experienced and highly-skilled technicians. These inspections are done with the
aid of binoculars and helicopters, where the inspector will be able to visualize points where damaged spots are seen. These traditional methods have several drawbacks: high operational cost, poor blind-area-free inspections and also fails to provide a safe working environment.

Item Type: Final Year Project
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Departments / MOR / COE: Engineering > Electrical and Electronic
Depositing User: Users 5 not found.
Date Deposited: 03 Nov 2011 11:23
Last Modified: 25 Jan 2017 09:43
URI: http://utpedia.utp.edu.my/id/eprint/1272

Actions (login required)

View Item
View Item