Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

SPATIAL ANALYSIS OF WORK PRODUCTION RATES FOR UTP R&D RESEARCH CENTRE

Teoh Hein Yik, Joshua (2015) SPATIAL ANALYSIS OF WORK PRODUCTION RATES FOR UTP R&D RESEARCH CENTRE. IRC, Universiti Teknologi PETRONAS. (Unpublished)

[img]
Preview
PDF
Download (3093Kb) | Preview

Abstract

The purpose of this report is to record down all the activities that are directly or indirectly contributed towards completing the author’s Final Year Project starting from September 2014 to May 2015. The author’s final year project shall show the spatial analysis of the work production rate for the UNIVERSITI TEKNOLOGI PETRONAS (UTP) new R&D Research Centre construction site. In this project, the author shall discuss on the method used to obtain the work production rate (Work Sampling Method), in which the work production is concluded as effective work, contributory work and ineffective work. Then the author had to show how to spatial analysed the data obtained by using the Geographic Information System (GIS). For the study of the work production rate, it was carried out on the three most contributing work forces available on the construction site which were the carpenters, bar benders and general workers. From the result, the author was able to determine the work production for each work force available in terms of effective work, contributory work and ineffective work. Furthermore, the author was able to determine the inter relationship between all the work forces by comparing the entire work production rate. Lastly, the author was able to present the data of work production rate using the ArcGIS 9.3 software by storing all the data and presenting the data using pie chart

Item Type: Final Year Project
Academic Subject : Academic Department - Civil Engineering - Water and environment - Water
Subject: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Engineering > Civil
Depositing User: Ahmad Suhairi Mohamed Lazim
Date Deposited: 30 Sep 2015 11:17
Last Modified: 25 Jan 2017 09:36
URI: http://utpedia.utp.edu.my/id/eprint/15637

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...