THE STUDY OF TIME AND COST OVERRUN IN THE CONSTRUCTION AND OIL AND GAS INDUSTRY

Salim, Ahmad Tirmidzi Zarfan (2016) THE STUDY OF TIME AND COST OVERRUN IN THE CONSTRUCTION AND OIL AND GAS INDUSTRY. [Final Year Project] (Submitted)

[thumbnail of Ahmad Tirmidzi Zarfan 15835 CVE - Final Dissertation.pdf] PDF
Ahmad Tirmidzi Zarfan 15835 CVE - Final Dissertation.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Construction time and cost overrun are not uncommon on construction projects world over
and also in Malaysia construction industry has not escaped the challenges of failing to
deliver project within time frame and with allocation budgeted. In order to find mitigation
measures of time and cost overrun, the first step is to identify the causes of these overruns.
This study assesses the causes of construction and oil gas projects time and cost overrun in
the Malaysia. The author includes the improvement in time and cost overrun that can be
implemented in construction and oil and gas projects in the future. In order to obtain data,
survey questionnaires and interviews are conducted to different management levels in
companies involved in construction and oil and gas projects

Item Type: Final Year Project
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Departments / MOR / COE: Engineering > Civil
Depositing User: Mr Ahmad Suhairi Mohamed Lazim
Date Deposited: 30 Mar 2017 11:58
Last Modified: 30 Mar 2017 11:58
URI: http://utpedia.utp.edu.my/id/eprint/17310

Actions (login required)

View Item
View Item