Mohd Yusuf, Muhammad Firdaus (2016) CHARACTERIZING SURFACE GROUND SETTLEMENT INDUCED BY UNDERGROUND TUNNEL EXCAVATION. [Final Year Project]
1. Final Dissertation 16231.pdf
Download (5MB) | Preview
Abstract
The construction of underground tunnel, without a proper mitigation and proper design, a catastrophic event may be happen due to ground sedimentation. In the view of the issue of ground movement, it is possible to predict the ground sedimentation by plotting a Gaussian graph perpendicular alongside the direction of tunnel construction. The information obtained in the qualitative and quantitative data can be used to solve the geotechnical problems. This is to provide enough and reliable information to evaluate the performance of the structure and also the characteristics of the soil. The study is based at the location of Greater Kuala Lumpur (KL) and Selangor, specifically from Sungai Buloh Station, then across to KL and will end at Taman Desa Seroja Station for in total of 51km and 31 stations
Item Type: | Final Year Project |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Departments / MOR / COE: | Engineering > Civil |
Depositing User: | Mr Ahmad Suhairi Mohamed Lazim |
Date Deposited: | 01 Aug 2018 09:58 |
Last Modified: | 01 Aug 2018 09:58 |
URI: | http://utpedia.utp.edu.my/id/eprint/17882 |