Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING

HASSAN, HANISAH (2009) FOUNDATION FIELDBUS 1NTEROPERABILITY TESTING. UNSPECIFIED. (Unpublished)

[img]
Preview
PDF
Download (12Mb) | Preview

Abstract

This report is to discuss about the research and testing of Basic Interoperability Testing for Foundation Fieldbus system. The Foundation Fieldbus is the new protocol that used in the PETRONAS process plant. Since that, PETRONAS personnel get lack of training in handling this new system. Devices that used in Foundation Fieldbus system can not work or interoperate with the devices from different manufacturers. This project is to perform the interoperability testing and the result will be used as the reference for Foundation Ficldbus system for PETRONAS personnel that handling this new system. Besides, the purpose of this project is to find out interoperability devices with the manufacturers system. The methodology towards achieving the objectives includes the theoretical and technical research, and testing the system and devices. Research and understanding of the project is very important. Some procedure needs to follow to get the desired result and accuracy and consistency of the result need to take to the consideration. The specific system need to conduct for the basic interoperability testing is Honeywell system. The tasks that should be done under this Basic Interoperability Test are device commissioning, device decommissioning, online device replacement, physical layer diagnostics, calibration function checks, and online parameter downloads. From this test, all the devices that had been tested were successfully done. The research for the Foundation Ficldbus should continuously perform to improve the system from time to time and the analysis of result and reports will use for a future research.

Item Type: Final Year Project
Subject: UNSPECIFIED
Divisions: Engineering > Electrical and Electronic
Depositing User: Users 5 not found.
Date Deposited: 21 Jun 2012 15:24
Last Modified: 25 Jan 2017 09:44
URI: http://utpedia.utp.edu.my/id/eprint/3283

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...