Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

Prioritizing Contractor Performance Criteria in Construction Project within Client Perspective

Mohd Haq bin Husin, Mohd Haq (2009) Prioritizing Contractor Performance Criteria in Construction Project within Client Perspective. Universiti Teknologi Petronas, Sri Iskandar,Tronoh,Perak. (Unpublished)

[img]
Preview
PDF
Download (34Mb) | Preview

Abstract

The objective of this study is to develop prioritize criteria in evaluating the performance of contractor in a construction project based on client perspective. Currently there is not any standard approach or agreement to evaluate contractor performance in construction project as project success carries different definition to different management. The focus on this study is on the private sector which different company has different type of management to measure the construction project performance. The study will involve collection of criteria to measure construction project performance from available source e. g. journal, magazine and book. Survey research methodology is chosen to be the technique to get the performance criteria used in current practice. The require information will be received from the questionnaires which are distributed to specific private company (respondent). Descriptive analysis method will be used to analyze the performance criteria and then prioritize criteria will be generated base on the analysis. The significant of the research will helps the client in current practice to ensure success in construction project as it provide better understanding on the most important criteria which should be applied by their contractor during construction stage. This finding would also directly help the contractor to be attentive and focus on every criteria that emphasized by the client. For contractor to gain client's satisfaction is vital as it would help them to gain more future project from the same client. It is hoped that by this findings will give benefits to all levels of professional levels related to this field and to the societies as well

Item Type: Final Year Project
Subject: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Engineering > Civil
Depositing User: Users 5 not found.
Date Deposited: 11 Jan 2012 12:24
Last Modified: 25 Jan 2017 09:44
URI: http://utpedia.utp.edu.my/id/eprint/560

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...