Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

Determination of Formation Temperature

Musiran, Noor Farhana (2011) Determination of Formation Temperature. Universiti Teknologi Petronas. (Unpublished)

[img] PDF
Download (2088Kb)

Abstract

This report was written to present a study to determine formation temperature. It will be divided into three main sections which are introduction, literature review and methodology. In the introduction, the author will discuss the background of study, problem statement, objectives, relevancy and feasibility of the study. In the literature review, the author will state the studies done in the past and related to this study. Lastly, the author will explain on how this study will be conducted in the methodology. Raw bottom-hole temperature (BHT) measured during drill-stem test on oil and gas wells are usually lower than the true formation temperature. There are several factors affecting the readings of formation temperature such as the circulation time of drilling mud, flow of formation fluid and thermal conductivities. There are a lot of studies done in the past to correct the raw BHT. This study will have a review on those studies and focus on developing a program that will yields the corrected formation temperature for each depth, if given elapsed time between the drilling stop, raw BHT and mud-circulation time, by using Visual Basic 6.0. Based on this study, the Effective Cooling Method had been identified as the most suitable method to be used.

Item Type: Final Year Project
Academic Subject : Academic Department - Petroleum Geosciences - Petrophysics - Petrophysical data acquisition
Subject: T Technology > T Technology (General)
Divisions: Geoscience and Petroleum Engineering
Depositing User: Users 2053 not found.
Date Deposited: 30 Sep 2013 16:25
Last Modified: 25 Jan 2017 09:42
URI: http://utpedia.utp.edu.my/id/eprint/7187

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...