Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

Project Cost Contingency Estimation Modeling Usinj Risk Analysis and Fuzzy Expert System

Rohman, Mohammad Arif (2009) Project Cost Contingency Estimation Modeling Usinj Risk Analysis and Fuzzy Expert System. Masters thesis, UNIVERSITI TEKNOLOGIPETRONAS.

[img] PDF
Download (5Mb)

Abstract

Determination of the appropriate project cost contingency, especially during the tendering stage is very important to ensure a successful bidding of the project. Setting too high a cost contingency will not make the tender look competitive, while putting too low will not cover risks that may cause cost overrun during the construction. Traditionally, contractors estimate cost contingency based on subjective judgment, such as 5-10% from the base cost estimated by considering past similar project. This method is typically derived from intuition, past experience and historical data. However, such method does not have a sound basis and is difficult to justify or defend. More objective methods for estimating project cost contingency have been presented. However, most of the methods still rely on formal modeling techniques which sometimes require the user to have knowledge and familiarity with statistical techniques. This research proposes a method to estimate cost contingency using a flexible and rational approach based on risk analysis andfuzzy expertsystem concept. This method could accommodate contractors' subjective judgment and also the use of risk analysis and management concept in the analysis process. The proposed method involved the development of cost contingency model for building and infrastructure projects in Malaysia. To develop the model, a number of common risk factors were identified from the literature. Data and information from the literature were also acquired to specify fuzzy expert system properties, such as membership function, rule base andfuzzy inference mechanism. The fuzzy expert system was developed using scenarios to predict percentage cost contingency allocation. The scenarios were then validated using three case projects by conducting face to face interviews with the project managers. From the validation, it was found that the predictions given by the system were within 20% accuracy compared to actual cost contingencies. A computer program was also developed using MATLAB software to demonstrate the model's application in estimating tender price during the bidding stage

Item Type: Thesis (Masters)
Academic Subject : Academic Department - Civil Engineering - Water and environment - Environmental - Solid waste
Subject: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Engineering > Civil
Depositing User: Users 2053 not found.
Date Deposited: 22 Oct 2013 12:08
Last Modified: 22 Oct 2013 12:08
URI: http://utpedia.utp.edu.my/id/eprint/9390

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...