Cold and hot water plumbing system on living quarters in an offshore platform

SHAHIR, ADIB ZULFADHLI (2011) Cold and hot water plumbing system on living quarters in an offshore platform. [Final Year Project] (Unpublished)

[thumbnail of Hot And Cold Water Plumbing System On Living Quarters In An Offshore Platfrom.pdf]
Preview
PDF
Hot And Cold Water Plumbing System On Living Quarters In An Offshore Platfrom.pdf

Download (2MB) | Preview

Abstract

The detailed development for East Piatu (EP) will have a separate Wellhead
Platform (WP) with 12 well slots, bridge linked to a manned Centnu Production Platform
(CPP) in 63 meters water depth. Produced oil and gas will be exported via pipelines and
tie-in to the export pipelines ofLarut·A production platform.
In an offshore platform, living quarters is an accommodation for all offshore
workers. It is also equipped with kitchen, canteen, management offices, workshops and
recreation areas. The importance of living quarters can be summarized with this
statement, an oil platform needs workers, and workers need accommodations.
Accommodations are Living Quarters. Good established living quarters is a well
functioned living quarters. Well functioned living quarters should have a good piping
system. The project focuses on the cold and hot water plumbing system of a living
quarter. The living quarters will have 4 levels and each level will be supply with hot and
cold water system.

Item Type: Final Year Project
Subjects: T Technology > TJ Mechanical engineering and machinery
Departments / MOR / COE: Engineering > Mechanical
Depositing User: Mr Ahmad Suhairi Mohamed Lazim
Date Deposited: 30 Mar 2015 11:54
Last Modified: 25 Jan 2017 09:42
URI: http://utpedia.utp.edu.my/id/eprint/15275

Actions (login required)

View Item
View Item