Amir Firdaus Bin Said, Amir Firdaus (2009) Optimization Of Cuf Generation During Parallel Operation With Electric Utility System. [Final Year Project] (Unpublished)
Full text not available from this repository.Abstract
Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel operation with electric utility system, field excitation and fuel input need to be optimize in order to prevent reactive power outflow to the utility system. These in turn, reduce the generation cost. The collection of technical details and data regarding the power flow at CUF plant was conducted then being modified to fit with the requirement of the simulation program.
Item Type: | Final Year Project |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Departments / MOR / COE: | Engineering > Electrical and Electronic |
Depositing User: | Users 5 not found. |
Date Deposited: | 11 Jan 2012 12:24 |
Last Modified: | 19 Jan 2017 15:48 |
URI: | http://utpedia.utp.edu.my/id/eprint/1626 |