Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

Integrated Pilot Plant for a Complete Decentralized Sewage Treatment

Gabriel , Wong Siong Tung (2016) Integrated Pilot Plant for a Complete Decentralized Sewage Treatment. IRC, Universiti Teknologi PETRONAS. (Submitted)

[img] PDF
Restricted to Registered users only

Download (1230Kb)

Abstract

Malaysia has been considered one of the fastest developing country in the entire ASEAN region, with many parts of the country being urbanised and industrialized. Same can be said for wastewater treatment facility in Malaysia that has also seen much improvements since the 1950s as the method of treatment and technologies used now are more advanced and produces a cleaner, more purified effluent. However, with that being said, presently many of the rural areas in Malaysia lack complete sewage treatment facilities as many of them are still using outdated treatment methods such as the septic tank or directly discharging their wastewater into the environment Thus, a plausible solution would be applying the integrated pilot plant in rural communities for a more complete sewage treatment facility that is expected to produce effluents that will adhere to the discharge limits of Standard B in Malaysia. The pilot plant integrates an anoxic tank where the anoxic condition is achieved by suspending and mixing the wastewater with sludge via the pumping action of influent wastewater to the bottom of the anoxic tank. Also, aerobic treatment where organic biodegradation happens in the aeration tank with the help of two rings of fine bubble diffusers powered by the air compressor.

Item Type: Final Year Project
Academic Subject : Academic Department - Civil Engineering - Water and environment - Water
Subject: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Engineering > Civil
Depositing User: Ahmad Suhairi Mohamed Lazim
Date Deposited: 26 Jan 2017 12:55
Last Modified: 26 Jan 2017 12:55
URI: http://utpedia.utp.edu.my/id/eprint/17178

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...