Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

Integration of RAM Model and DES Method in Assessing Plant Utilization

Hassan, Muhamad Shukri (2020) Integration of RAM Model and DES Method in Assessing Plant Utilization. IRC, UTP. (Submitted)

[img]
Preview
PDF
Download (1362Kb) | Preview

Abstract

This Final Year Project (FYP) entitled Integration of RAM Model and DES Method in Assessing Plant Utilization. Main motivation of this project is about plant utilization in oil and gas refinery plant. Plant utilization is an important indicator for a company to measure the production rate, operation safety and operation’s availability. Nevertheless, the percentage of plant utilization will be reduced due to the unplanned operation shutdown and slowdown. Basically, the unplanned shutdown occurs when the production units completely stopped unexpectedly due to failure of major components in main equipment which required a significant of time to repair. Meanwhile, the unit slowdown means the production unit incapable to produce the targeted number of products per day. It is quite tough for the company to cater these unfavourable events because there are numerous of production unit, equipment and components in the refinery plant. Thus, this study had focused to assess the plant utilization of oil and gas refinery by using two approaches to model the performance of refinery plant which are RAM model and DES method.

Item Type: Final Year Project
Academic Subject : Academic Department - Mechanical Engineering - Materials - Engineering materials - Polymers - Flow simulation
Subject: T Technology > TJ Mechanical engineering and machinery
Divisions: Engineering > Mechanical
Depositing User: Ahmad Suhairi Mohamed Lazim
Date Deposited: 06 Apr 2021 15:54
Last Modified: 06 Apr 2021 15:54
URI: http://utpedia.utp.edu.my/id/eprint/20352

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...