Piping Inspection Monitoring Strategy

Mohd Fithri Azad Bin Abul Kalam Azad, Mohd Fithri Azad (2011) Piping Inspection Monitoring Strategy. [Final Year Project] (Unpublished)

[thumbnail of Mohd_Fithri_Azad_Bin_Abul_Kalam_Azad.pdf]
Preview
PDF
Mohd_Fithri_Azad_Bin_Abul_Kalam_Azad.pdf

Download (1MB)

Abstract

The objective of this project is to develop an inspection planning by applying the thickness measurement method in order to get the remaining life of the piping component/system at the Naphtha hydro-finer line. This is related to the problem occur in order to replace the inspection conventional method to the Risk Base Inspection (RBI) method to analyze the pipe system more efficient.

Item Type: Final Year Project
Subjects: T Technology > TJ Mechanical engineering and machinery
Departments / MOR / COE: Engineering > Mechanical
Depositing User: Users 5 not found.
Date Deposited: 11 Jan 2012 12:18
Last Modified: 25 Jan 2017 09:41
URI: http://utpedia.utp.edu.my/id/eprint/345

Actions (login required)

View Item
View Item