Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

STUCK DRILL PIPE WHILE DRILLING OPERATION

Abdelwahid, Mohamed Noureldin (2008) STUCK DRILL PIPE WHILE DRILLING OPERATION. UNIVERSITI TEKNOLOGI PETRONAS. (Unpublished)

[img]
Preview
PDF
Download (1286Kb) | Preview

Abstract

Oil and companies spend about $20 billion annually on drilling. Unfortunately, not of that money is well spent. A significant portion, around 15%, is attributed to losses. These losses include loss of material, such as drilling equipment (Stuck pipe) and fluids, and loss of drilling process continuity, called nonproductive time (NPT). The objective s of this project are mainly concern and focusing about the downhoe problem during drilling operation in particularly the stuck pipe. The significant objectives of this project are:  To measure the parameters that cause the stuck pipe such as Bit weight, coefficient of friction, rate of penetration ,drag and force and mud density  To identify the potential formation that makes the stuck pipe by drilling fluid. The methodology of the project are first to have an ultimate background about the downhole problem and the causes that associated with stuck pipe, gathering necessary data for the analysis purpose and compare with the theoretical knowledge and to further conduct an experiment on the drilling fluid to configure the mud cake that mainly cause the differential stuck.

Item Type: Final Year Project
Subject: T Technology > TJ Mechanical engineering and machinery
Divisions: Engineering > Mechanical
Depositing User: Users 2053 not found.
Date Deposited: 04 Oct 2012 14:28
Last Modified: 25 Jan 2017 09:45
URI: http://utpedia.utp.edu.my/id/eprint/4014

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...