INVESTIGATING THE PROBLEMS THAT OCCURED IN TWO CONSTRUCTION PROJECT DUE TO IMPROPER PLANNING

Ab Rahman, Noor Nasuha (2011) INVESTIGATING THE PROBLEMS THAT OCCURED IN TWO CONSTRUCTION PROJECT DUE TO IMPROPER PLANNING. [Final Year Project] (Unpublished)

[thumbnail of 2011 - Investigating the Problems That occured in Two Construction Project Due to Improper Planni.pdf] PDF
2011 - Investigating the Problems That occured in Two Construction Project Due to Improper Planni.pdf

Download (4MB)

Abstract

In project management, planning is the tool that is used to analyzing each activity
and its relationship to the one that come before and after it. Planning establish
relationships, identify resources needed to complete each task, and highlight the
activities that, if late, could jeopardize the overall completion date. The several
parties engaged in a building project are exposed to different forms of risk and, as a
result, their interest in work planning is likely to vary. The scope and detail of
planning will also vary according to factors such as the type of project, its location,
how the project is organised and the economic climate. The perception of risk by
clients, project managers and design consultants may play a part in determining the
amount of planning that they decide to do and how much money are prepared spend
on it. This study will focus on the Construction of Hotel and Office Tower on Plot
Z10, Precinct 1, Wilayah Persekutuan Putrajaya and Construction of 14 Blocks 230
Units Shop Offices and 28 Units Penthouse ( Phase 5) on Lot PB 1, City Centre 1,
Kota Damansara, Mukim Sungai Buluh, Daerah Petaling, Selangor. The objective of
this study is to identify and prioritizes the problems that occur due to improper
planning during the construction of the two projects and identify and prioritize the
factor that caused the problems. Pilot survey is conducted to develop and test
adequacy of questionnaire and assess the feasibility of the survey. Progress reports
for each project are analyzed and surveys and interviews are conducted to identify
and prioritize problems that occurred during the construction and determine the
factors that caused the problems. A few recommendations are made to overcome the
problems.

Item Type: Final Year Project
Subjects: T Technology > T Technology (General)
Departments / MOR / COE: Engineering > Civil
Depositing User: Users 2053 not found.
Date Deposited: 30 Sep 2013 16:55
Last Modified: 25 Jan 2017 09:42
URI: http://utpedia.utp.edu.my/id/eprint/7492

Actions (login required)

View Item
View Item