PERFORMANCE EVALUATION MODELING OF PRE-TREATMENT UNIT IN GAS PROCESSING PLANT

Sulaiman, Mohamad Rozi (2011) PERFORMANCE EVALUATION MODELING OF PRE-TREATMENT UNIT IN GAS PROCESSING PLANT. [Final Year Project] (Unpublished)

[thumbnail of 2011 - Performance evaluation modeling of pre-treatment unit in gas processing plant.pdf] PDF
2011 - Performance evaluation modeling of pre-treatment unit in gas processing plant.pdf

Download (2MB)

Abstract

This paper presents a report for Final Year Project (FYP). The title of the
research project is Performance Evaluation Modeling of Pre-Treatment Unit (PTU) in
Gas Processing Plant which under manufacturing from mechanical field. The project is
conducted at one of Gas Processing Plant which is Pre-treatment Unit (PTU). The
project started with identification of critical component for PTU, construction of
reliability block diagram (RBD) and reliability analysis based on RBD model. During
the completion of the project, the researcher has been assisted by reliability engineer
from PETRONAS Gas Berhad in verifying the RBD model. The outcome of this project
is a model of reliability that could be used by plant management to evaluate the current
reliability of the PTU. Besides, this research can analyze whether that equipment has
achieved target plant reliability and identify the sub-component that reduces the overall
reliability of the system. This paper includes introduction, literature review,
methodology, result and discussion and conclusion. The report will include introduction,
literature review and theory, methodology, result and discussion, conclusion and
recommendation and reference.

Item Type: Final Year Project
Subjects: T Technology > TJ Mechanical engineering and machinery
Departments / MOR / COE: Engineering > Mechanical
Depositing User: Users 2053 not found.
Date Deposited: 09 Oct 2013 11:07
Last Modified: 25 Jan 2017 09:41
URI: http://utpedia.utp.edu.my/id/eprint/8316

Actions (login required)

View Item
View Item