Welcome To UTPedia

We would like to introduce you, the new knowledge repository product called UTPedia. The UTP Electronic and Digital Intellectual Asset. It stores digitized version of thesis, dissertation, final year project reports and past year examination questions.

Browse content of UTPedia using Year, Subject, Department and Author and Search for required document using Searching facilities included in UTPedia. UTPedia with full text are accessible for all registered users, whereas only the physical information and metadata can be retrieved by public users. UTPedia collaborating and connecting peoples with university’s intellectual works from anywhere.

Disclaimer - Universiti Teknologi PETRONAS shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.Best viewed using Mozilla Firefox 3 or IE 7 with resolution 1024 x 768.

PRE-DESIGN LATENT HEAT THERMAL ENERGY STORAGE USING ENERGY FROM ELECTRICITY GRID

Mohd Nasihuddin, Wan Mohd Hariri (2009) PRE-DESIGN LATENT HEAT THERMAL ENERGY STORAGE USING ENERGY FROM ELECTRICITY GRID. Universiti Teknologi PETRONAS. (Unpublished)

[img] PDF
Download (1748Kb)

Abstract

Universiti Teknologi Petronas currently uses Gas District Cooling (UTP GDC) as cooling system in the university. UTP GDC system stores chilled water thermal energy storage andusing electricity generated from gasturbine. The current set up is using huge volume of tank storage and high capacities of equipments then lead to high operation cost. Based on previous research, there is still room of improvement for UTP air conditioning system. In this project, the chilled water thermal energy storage will be replaced with ice thermal energy storage and the gas turbine as electricity generator will be replaced with direct electricity from the Tenaga Nasional Berhad grid. The basic principle of this project is the chillers only run during the off-peak rate to charge the storage tank for day use. It is to minimize the operating cost. For that purpose, 37100 RTh cooling load needs to be stored. By using ice, the volume of tank storage can be reduced to2700m3. Existing tank needs to undergo several modifications to store ice. For ice storage, it will contain 3 297 700 nodules AC.00. In order to ensure sufficient storage for the system,6 brine chillers are used to replace existing4 electric chillers and 2 steam absorption chillers. Chillers will be operating for 11 hours during the off-peak rate while the existing chillers are running 24 hours. The system is going to use four pumps. Each pumpconsists of 210 kW.Heatexchanger capacity is 29700 kW. Economic analysis and designjustifications are done to ensure the feasibility of the project. Based on operation and maintenance cost analysis, this project can save a lot of money for each month of operation. The saving is at least aboutRM 100000 per month and value of energy per unit volume increases 13 times from the existing design. Other design justifications are environmental protection and high reliability. All of those justifications prove that this project is viable to develop.

Item Type: Final Year Project
Academic Subject : Academic Department - Mechanical Engineering - Petroleum
Subject: T Technology > TJ Mechanical engineering and machinery
Divisions: Engineering > Mechanical
Depositing User: Users 2053 not found.
Date Deposited: 22 Oct 2013 09:36
Last Modified: 22 Oct 2013 09:36
URI: http://utpedia.utp.edu.my/id/eprint/9107

Actions (login required)

View Item View Item

Document Downloads

More statistics for this item...