Field Development Cost Forecast in Malaysia

Khalil, Nor Amirul Ashraf (2011) Field Development Cost Forecast in Malaysia. [Final Year Project] (Unpublished)

[thumbnail of 2011 - Field development cost forecast in Malaysia.pdf] PDF
2011 - Field development cost forecast in Malaysia.pdf

Download (1MB)

Abstract

A Field development project is an early stage of a field cycle. Before any action is
carried out there must be a study done to estimate all the cost involved to make a
specific project worth to be approved. To achieve this many different software and
techniques are applied to minimize investments and maximize the revenue. However,
each project has their own requirements to be fulfilled making it harder to use certain
software to obtain great result The E&P industry has worked for years to develop
software tools to help integrate various subject matter estimates into a unified model
of the business plan for oil and gas assets.
Questor that developed by IHS is one of the tool that involve with cost estimation or
in other word a tool that used to forecast the cost for a specific project of a field. It is
include with project cost estimation for offshore structures and reduce the time for
cost estimation for onshore by analyzing certain components. All these components
are being considered before any summary of cost involved is finalized.

Item Type: Final Year Project
Subjects: T Technology > T Technology (General)
Departments / MOR / COE: Geoscience and Petroleum Engineering
Depositing User: Users 2053 not found.
Date Deposited: 12 Nov 2013 10:21
Last Modified: 25 Jan 2017 09:42
URI: http://utpedia.utp.edu.my/id/eprint/10465

Actions (login required)

View Item
View Item