Felipe Nguema Eman Andeme, Felipe Nguema (2010) A PROPOSED LOAD SHEDDING SCHEME FOR EG LNG PLANT. [Final Year Project] (Unpublished)
Preview
felipe_nguema_eman_andeme.pdf
Download (16MB)
Abstract
This report presents a prepossessed methodology for a design of automatic under-frequency load shedding scheme. The network of Equatorial Guinea Liquefied Natural Gas Plant has been chosen for implementation. The project involves one main objective which is to design and implement, through simulation, an automatic load shedding scheme suitable for the network. The plant load is divided into different categories.
Item Type: | Final Year Project |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Departments / MOR / COE: | Engineering > Electrical and Electronic |
Depositing User: | Users 5 not found. |
Date Deposited: | 03 Nov 2011 11:23 |
Last Modified: | 09 Oct 2023 03:53 |
URI: | http://utpedia.utp.edu.my/id/eprint/1082 |