Kakajykov, Arslan (2009) Congestion Management in Deregulated Power System Using FACTS Devices. [Final Year Project] (Unpublished)
Full text not available from this repository.Abstract
In a deregulated electricity market, it may always not be possible to dispatch all of the contracted power transactions due to congestion of the transmission corridors. Congestion in the transmission lines is one of the technical problems that appears particularly in the deregulated environment. The ongoing power system restructuring requires an opening of unused potentials of transmission system due to environmental, right-of-way and cost problems which are major hurdles for power transmission network expansion. Flexible ac transmission systems devices can be an alternative to reduce the flows in heavily loaded lines, resulting in increased load ability, low system loss, improved stability of the network, reduced cost of production and fulfilled contractual requirement by controlling the power flows in the network.
Item Type: | Final Year Project |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Departments / MOR / COE: | Sciences and Information Technology |
Depositing User: | Users 5 not found. |
Date Deposited: | 11 Jan 2012 12:24 |
Last Modified: | 19 Jan 2017 15:48 |
URI: | http://utpedia.utp.edu.my/id/eprint/1575 |