Settlement Analysis due to Micro-Tunnelling Works

Che Hassan, Nur Muhammad Hadri (2017) Settlement Analysis due to Micro-Tunnelling Works. [Final Year Project] (Submitted)

[thumbnail of 1. Final Dissertation_19441.pdf] PDF
1. Final Dissertation_19441.pdf
Restricted to Registered users only

Download (4MB)

Abstract

Underground sewage system has been designed with a view to modern man’s
inclination toward health, hygiene and his aversion to filth and pollutants. Currently
there is on-going project at Ipoh, Perak. It is a project to build a sewerage treatment
plant and sub-catchment pipeline network across Ipoh City. Underground pipe usually
installed using open-trench method but in this project, the pipe was laid down using
trenchless method. Trenchless method involved the use of micro-tunnelling technique.
This disquisition is intended to analyse the longitudinal settlement and transverse
settlement induced by the micro-tunnelling activity of the 1050mm and 1500mm
diameter sewage pipeline at Jalan President Kennedy, Pasir Puteh and Jalan Sri Kinta
1 Ipoh, Perak. A ground level movement were monitor closely using marker placed at
the activity location.

Item Type: Final Year Project
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Departments / MOR / COE: Engineering > Civil
Depositing User: Mr Ahmad Suhairi Mohamed Lazim
Date Deposited: 02 Mar 2022 15:31
Last Modified: 02 Mar 2022 15:31
URI: http://utpedia.utp.edu.my/id/eprint/22857

Actions (login required)

View Item
View Item