CHIN, KAREN MAY LIN (2021) DEVELOPMENT AND COST ANALYSIS OF A NEW IBS SYSTEM. [Final Year Project] (Submitted)
Preview
Dissertation_Karen_24527.pdf
Download (2MB) | Preview
Abstract
Conventional in-situ construction has indeed been one of the most common
construction methods till date, and is being adopted in most of the construction
projects in Malaysia. Despite its familiarity among designers, contractors and labours,
there are many disadvantages of it, including time consuming, labour intensive,
dangerous site condition and many more. Cost and time overrun due to the usage of
unskilled foreign worker proves the need of shifting to a more organized method of
construction, which is the Industrialized Building System (IBS).
Item Type: | Final Year Project |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Departments / MOR / COE: | Engineering > Civil |
Depositing User: | Mr Ahmad Suhairi Mohamed Lazim |
Date Deposited: | 04 Mar 2022 07:12 |
Last Modified: | 04 Mar 2022 07:12 |
URI: | http://utpedia.utp.edu.my/id/eprint/22909 |