JAMAL, IRFAN IBRAHIM (2021) STUDY ON CEMENT-FORMATION BONDING BY USING DIFFERENT FORMATION LITHOLOGY. [Final Year Project] (Submitted)
PDF
22844.pdf
Restricted to Registered users only
Download (2MB)
22844.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Quality of the cement job is vital to ensure economical, safe and stable production from a reservoir. A crucial part of this is the ability of cement to bond to the formation. Improper removal of drilling fluid or cement placement, or de-bonding due to unfavorable wellbore conditions can create potential flow paths. Zonal isolation losses from a cement sheath failure can occur in three places: in the cement forming interface, the bulk cement or the casing cement interface.
Item Type: | Final Year Project |
---|---|
Subjects: | Q Science > QE Geology |
Departments / MOR / COE: | Geoscience and Petroleum Engineering |
Depositing User: | Mr Ahmad Suhairi Mohamed Lazim |
Date Deposited: | 21 Sep 2022 03:28 |
Last Modified: | 21 Sep 2022 03:28 |
URI: | http://utpedia.utp.edu.my/id/eprint/23306 |