Surface Settlement caused by Pipe Jacking Works crossing KL-Seremban Highway

Razali, Nur Diana Natasya (2022) Surface Settlement caused by Pipe Jacking Works crossing KL-Seremban Highway. [Final Year Project] (Submitted)

[thumbnail of Surface Settlement caused by Pipe Jacking Works crossing.pdf]
Preview
Text
Surface Settlement caused by Pipe Jacking Works crossing.pdf

Download (3MB) | Preview

Abstract

The rapid growth of rehabilitation systems has resulted in an increasing demand for tunnelling technology that can operate in extreme conditions which involves deep excavations and interruptions of utility lines and traffic flow. The chosen project comprising the installation of DN2500 mm sewerage reinforced jacking pipe (RCJP) using pipe jacking method. The proposed project site in Kuala Lumpur is located at KM D7.4 along KL-Seremban Highway. This paper aims to correlate the TBM parameter with ground condition due to huge excavation induced by tunnelling activity and to produce Gaussian Distribution Curve by applying empirical method and determine the volume loss of tunnelling.

Item Type: Final Year Project
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Departments / MOR / COE: Engineering > Civil
Depositing User: Ms Nurul Aidayana Mohammad Noordin
Date Deposited: 14 Feb 2023 07:02
Last Modified: 17 Mar 2023 07:57
URI: http://utpedia.utp.edu.my/id/eprint/24152

Actions (login required)

View Item
View Item