Abstract

High-pressure, high-temperature (HPHT) wells are defined differently throughout the industry. The UK Energy Institute’s Model Code of Safe Practice in the Petroleum Industry defines HPHT wells as “where undisturbed bottomhole temperature exceeds 300°F (149°C) and where mud weight in excess of 15.4 ppg is needed, or where pressure-control equipment over 10,000 psi is needed.” In HPHT well,its well-known that there are so many complexities . The challenges in high temperature, high pressure cementing are usually connected to the
· Temperature regimes
· Pressure regimes
· Narrow margin between fracture and pore pressures
· Wellbore geometry. (i.e. often 5 ½” or 7” liners in high pressure zones.)
· Control of flow (gas migration) after cementing
· Chemical behaviour of mud, cement, and its additives that exist in the well and their individual and combined effects of the mud, cement and the formation characteristics.
However, regardless of those dangers and expense, the number of HPHT wells is increasing in many areas of the world. Acceptable production from HPHT well needs successful drilling and completion operation. Hence, cementing of an HPHT well is an essential part of completion and it influences the future production from the well. Designing proper cement program which is compatible with formation conditions is one of the most significant factors for a successful cement job.
This study aims on how to reduce the results of failed cement job which involved time and high cost,remedial work,and cause kick & well control problems. It needs an extra care from time to time and a software is used in order to monitor all the characteristics of the cement during the cementing job.
Through this research and studies, problems has been resolved by designing the suitable cement program. Overall data was used in OptiCem module to simulate and observe casing cementing procedures. The main concern during cementing operation found out to be ECD, which is highly affected by several factors

Item Type: Final Year Project
Subjects: T Technology > TN Mining engineering. Metallurgy
Departments / MOR / COE: Geoscience and Petroleum Engineering
Depositing User: Users 2053 not found.
Date Deposited: 04 Mar 2013 09:11
Last Modified: 25 Jan 2017 09:39
URI: http://utpedia.utp.edu.my/id/eprint/5684

Actions (login required)

View Item
View Item