Ab Rashid, Mohamad Azwan (2013) The Effect of Detention Pond’s Outlet Design to the Peak Discharge of a Watershed. [Final Year Project] (Unpublished)
PDF
Final Dissertation1.pdf
Download (2MB)
Final Dissertation1.pdf
Download (2MB)
Abstract
Flood occurs when the water discharge of a watershed exceed the drain capacity. One of the solutions to avoid flood when this occurs is by having a detention pond to control the amount of water discharge below the discharge capacity of the drain. This research project is to explore further on the effect of detention pond built in terms of its outlet design base on simple outlet structures frequently used by JPS
Item Type: | Final Year Project |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Departments / MOR / COE: | Engineering > Civil |
Depositing User: | Users 2053 not found. |
Date Deposited: | 04 Oct 2013 15:56 |
Last Modified: | 04 Oct 2013 15:56 |
URI: | http://utpedia.utp.edu.my/id/eprint/8201 |