Development of Redundancy Model for Co-generation Plant

Ahmad Redzuan, Ahmad Zhafran (2013) Development of Redundancy Model for Co-generation Plant. [Final Year Project] (Unpublished)

[thumbnail of dissertation_Ahmad Zhafran.pdf]
Preview
PDF
dissertation_Ahmad Zhafran.pdf

Download (3MB) | Preview

Abstract

This study presents development of redundancy model for co-generation plant. The study is focused on small cogeneration plant which produces power below 10MW. UTP-GDC plant was chosen as the model because of its location and accessibility to information. The development of redundancy model is important to provide analysis for future improvement of small co-generation plant. Cogeneration plant did experience some trouble when the turbine fails to operate and results in blackout situation. During this situation, the approach usually taken by small plant is to get electrical supply from TNB. In this study, two alternatives were being compared and investigated in terms of economic that will help the plant manager to make decision. The

Item Type: Final Year Project
Subjects: T Technology > TJ Mechanical engineering and machinery
Departments / MOR / COE: Engineering > Mechanical
Depositing User: Users 2053 not found.
Date Deposited: 01 Apr 2014 16:07
Last Modified: 25 Jan 2017 09:38
URI: http://utpedia.utp.edu.my/id/eprint/13735

Actions (login required)

View Item
View Item