Foundation Fieldbus Interoperability Testing On Project

Nur Amnanie Binti Zulkifli, Nur Amnanie (2009) Foundation Fieldbus Interoperability Testing On Project. [Final Year Project] (Unpublished)

[thumbnail of NUR_AMNANIE_BINTI_ZULKIFLI.pdf]
Preview
PDF
NUR_AMNANIE_BINTI_ZULKIFLI.pdf

Download (2MB)

Abstract

Since Fieldbus was introduced in 1980s, leading process control suppliers started to implement their own proprietary protocols and none of them could talk together. The Foundation Fieldbus was implemented in 1994 to achieve an internationally fieldbus standard. A test need to be conducted to proved the interoperability of Foundation Fieldbus. This report will discuss about the Fieldbus and the work that done during the Foundation Fieldbus Interoperability Testing. The main objective of this project is to perform technical verification and interoperability of Foundation Fieldbus host and devices from various manufacturers. For the industry to adapt to the Fieldbus system, a comprehensive understanding on the operability of the system is required. This project aims to provide a familiarization to the Fieldbus system for scientific researchers and engineers for further development intended for laboratory or industrial application and testing. The laboratory testing will cover three main tests which are basic interoperability test, stress test and diagnostics capability test. For the first phase, the test is focused on basic test. The test will be conduct using the Yokogawa Centum CS3000 system as hosts. The outcome of this test will be implemented in PETRONAS Groupwide in the form of guidelines, procedures and standards on Foundation Fieldbus.

Item Type: Final Year Project
Subjects: T Technology > TP Chemical technology
Departments / MOR / COE: Engineering > Electrical and Electronic
Depositing User: Users 5 not found.
Date Deposited: 11 Jan 2012 12:23
Last Modified: 25 Jan 2017 09:44
URI: http://utpedia.utp.edu.my/id/eprint/934

Actions (login required)

View Item
View Item